NEEDS IN OCTOBER 2016 and our help
Here is the list of their needs:
* complete renovation of the toilets (2 for boys + 2 for girls)
* installation of 2 water tanks (purchased in 2018)
* construction of a refectory and 3 additional classrooms
* construction of the perimeter wall of the school and of a playground
* whiteboards (bought in 2018: 4 boards + 10 markers + 10 brushes)
* tables and rugs
* 2 school uniforms per year for each student
* constitution of a computer class to learn the basics
The letter from the school director

Damage report

Our team on an annual visit listening to the needs for school equipment and repairs after the earthquake

like restoring toilets and cracked walls ......

_JPG.jpg)
Titre 2

....... the installation of gutters
The temporary classroom after the earthquake
Due to a school consolidation, the school was closed in 2020.
The equipment provided by the association was transferred to the establishment which now accommodates the students.
YTS takes advantage of this change to redirect its action towards sponsoring a student
(see tab "Mentoring 2020")